Travel Time Data - End of lifecycle
— "TravelTimeData" and "PredefinedTravelTimeLocations" publications will be gradually retired as part of modernisation of the travel time data solution.
News, press releases and feature articles from the Norwegian Public Roads Administration
— "TravelTimeData" and "PredefinedTravelTimeLocations" publications will be gradually retired as part of modernisation of the travel time data solution.
— On Saturday, the Norwegian Directorate of Public Roads granted an exception to the rules on driving time and rest periods.
— The Hangar Bridge – measuring 55 metres in length, 9 metres in width, and weighing 60 tonnes – has been successfully installed in Trondheim.
— The Hangar Bridge – measuring 55 metres in length, 9 metres in width, and weighing 60 tonnes – has been successfully installed in Trondheim.
— 200 participants gathered in Luleå with a focus on cross-border collaboration on infrastructure in Northern Norway, Northern Sweden, and Northern Finland.
— When today the MF Hydra is put into operation running on zero-emission hydrogen, this is groundbreaking in several ways.
— The new DATEX version 3.1 publications are accessible from 1 February 2023.